Skip to main content

Snyder Industries

Snyder Industries 3 Inch Siphon Tube CPVC - Slip Fit Schedule 80

$195.04
0
(No reviews yet) Write a Review
Adding to cart… The item has been added
SKU:
SII-34700910
Availability:
In Stock - Ships from nearest manufacturing plant
Weight:
2.00 LBS
Width:
3.94 (in)
Height:
3.94 (in)
Depth:
12.00 (in)
Material:
CPVC
Length:
12"
Diameter:
3 Inch
Freight Class:
UPS
NMFC Code:
95190
Manufacturer Part Number:
34700910
Manufacturer:
Snyder Industries
Technical Drawing:
https://onesourceplastics.com/content/snyder-technical-drawings/snyder-sii-34700910.pdf
Ship Weight:
2 lb
Ship Dimensions:
12" L x 12" W x 12" H
Fitting / Valve Size:
3 Inch
OSP Image Lock:
LOCKED 10/22/26 - image approved by Tank; do not replace or regenerate. Ask Tank first.

A 3 inch Schedule 80 CPVC siphon tube, slip fit

Part number 34700910 is Snyder's 3 inch siphon tube in Schedule 80 CPVC with a slip fit end. A siphon tube is a short length of pipe that sits inside the tank on the back of a fitting and moves the point the liquid is drawn from. On a flat-bottom tank with a sidewall outlet, the fitting has to sit a little way up the wall, which leaves liquid below it that a straight outlet can never reach. A siphon tube turned down toward the floor lets the outlet draw that last few inches. This one is 12 inches long, about 3.94 inches across, and weighs 2 lb. Schedule 80 CPVC is the heavy-wall, higher-temperature grade. The 3 inch size has to match the fitting it slips into.

Which fitting does it go with? Add it to your cart at the top of this page, get LTL freight to your ZIP, or call 866-418-1777. The listed price is before freight.

What to check before you buy

  1. The fitting. The tube slips into the inside of a 3 inch fitting. Tell us the fitting part number and we confirm the pairing with Snyder before the order ships. Snyder's drawing for the tube is linked on this page under Technical Drawing.
  2. The reach. At 12 inches the tube is sized for where Snyder puts its sidewall outlets on larger tanks. Compare it with the height of your outlet above the tank floor, on the tank's own drawing, before you decide it solves the problem.
  3. The liquid and its temperature. CPVC takes more heat than PVC and handles many chemicals that PVC does not. Check the liquid against CPVC, and tell us the service temperature if it runs warm.
  4. The volume you are chasing. If the point is to stop leaving liquid in the tank, the tank sizing calculator and tank sizing guide tell you how much a few inches at the bottom of your tank actually holds.

Installing it

The tube is fitted from inside the tank, so it goes in while the tank is empty and before the manway is out of reach. Dry-fit it to the fitting, turn it so the open end points at the floor and sits clear of the wall, and only then make the slip joint up with the cement that matches the material, following the cement maker's cure time before the first fill. Leave a gap between the tube and the tank floor so the outlet can draw. Fill with water the first time and watch the outlet run down.

Shipping

This is a 2 lb part in a 12 by 12 by 12 inch carton and it travels by UPS from Snyder's Lincoln, Nebraska plant when ordered loose. Fittings installed on a tank at the factory ship with the tank from that tank's plant. The listed price is before freight; the freight cost estimator gives the cost to your ZIP. Order it with the tank and the fitting so all three arrive together.

​‌​​​​‌‌​​‌​​‌​‌​​​​‌‌‌​‌​​‌‌‌‌​​‌​​‌​‌​

Freight and documents

LTL freight is quoted to your ZIP with the freight cost estimator or by phone at 866-418-1777. The listed price is before freight.

Technical drawing (PDF) for Snyder Industries 34700910.

Ready to order?

Add it to your cart at the top of this page, get LTL freight to your ZIP, or call 866-418-1777. The listed price is before freight.

Adding to cart… The item has been added