Skip to main content

Snyder Industries

Snyder Industries 4 Inch SCH 80 CPVC Slip Fit Siphon Tube

$247.74
0
(No reviews yet) Write a Review
Adding to cart… The item has been added
SKU:
SII-34700911
Availability:
In Stock - Ships from nearest manufacturing plant
Weight:
6.00 LBS
Width:
9.00 (in)
Height:
4.00 (in)
Depth:
9.00 (in)
Material:
CPVC
Length:
9"
Diameter:
4 Inch
Freight Class:
UPS
NMFC Code:
95190
Manufacturer Part Number:
34700911
Manufacturer:
Snyder Industries
Technical Drawing:
https://onesourceplastics.com/content/snyder-technical-drawings/snyder-sii-34700911.pdf
Ship Weight:
5 lb
Ship Dimensions:
20" L x 20" W x 20" H
Fitting / Valve Size:
4 Inch
OSP Image Lock:
LOCKED 10/22/26 - image approved by Tank; do not replace or regenerate. Ask Tank first.

A 4 inch schedule 80 CPVC slip fit siphon tube for drawing from the top of a tank

Part number 34700911 is Snyder's 4 inch slip fit siphon tube in schedule 80 CPVC. A siphon tube is how you draw liquid out of a tank through a fitting mounted above the liquid, instead of cutting an outlet low in the wall: the tube hangs down inside from the top fitting, the pump pulls through it, and the tank wall below the liquid line stays unbroken. Slip fit means it pushes into a matching 4 inch socket rather than threading. Schedule 80 is the heavy wall grade of CPVC, and CPVC is the choice over plain PVC where the liquid runs warm. The piece is 9 by 9 by 4 inches as supplied, and it ships by UPS.

Not sure it suits your tank or your liquid? Call 866-418-1777 with the tank part number and the fitting it drops through, or add it to your cart above.

What to check before you buy

  1. The size. 4 inch slip fit. It has to match a 4 inch socket on the tank fitting it goes into; tell us the fitting and we confirm the pair.
  2. The drop. How far down the tank the tube needs to reach depends on the tank height and how low you want to pull from. Measure from the top fitting to the point you want to draw from and tell us that figure; confirm the supplied length against it before the order ships.
  3. The liquid. CPVC suits water and many common chemicals and takes more heat than PVC. Check the liquid in our chemical compatibility guide before you order.
  4. Volume. Still deciding the tank? Our tank sizing calculator and tank sizing guide settle the gallons first.

Snyder's drawing for this part is linked on this page under Technical Drawing. If you are also fitting a level gauge, our guide to sight glass and sight tube level indication on polyethylene tanks covers the material and freeze questions that apply to any external tube.

Installing it

Dry-fit the tube in its socket and check that it hangs clear of the tank wall and any agitator or float before you solvent weld anything. A siphon tube only pulls as long as the pump keeps the prime, so plan the pump and a foot valve or check valve as one system. Keep the bottom of the tube off the tank floor so it does not pick up sediment, and prove the draw with water before the working liquid goes in.

Shipping

Ships by UPS in a 20 by 20 by 20 inch carton at a 5 lb ship weight from Snyder's Lincoln, Nebraska plant when ordered loose. Fittings installed on a tank at the factory ship with the tank from that tank's plant. The listed price is before freight; the freight cost estimator gives the cost to your ZIP. Put it on the same order as the tank.

‌​‌‌‌‌‌​​‌​‌​​​​​‌‌‌​​​‌‌​‌‌‌​​‌‌‌​​​‌‌​

Freight and documents

LTL freight is quoted to your ZIP with the freight cost estimator or by phone at 866-418-1777. The listed price is before freight.

Technical drawing (PDF) for Snyder Industries 34700911.

Ready to order?

Add it to your cart at the top of this page, get LTL freight to your ZIP, or call 866-418-1777. The listed price is before freight.

Adding to cart… The item has been added